NEW YORK - The MTA says subway service has been suspended between the Willets Point and Main Street-Flushing stations on the 7 line after a crane dropped construction materials onto the tracks.

A spokeswoman for New York's Metropolitan Transportation Authority says the incident happened shortly after 1 p.m. Saturday.

She says construction crane dropped a large piece of steel onto the tracks and caused a small electrical fire.

The MTA shut off power in the area so crews could remove debris and assess the damage to the tracks.

advertisement | advertise on newsday

Shuttle buses are running between Willets Point and Main Street Flushing.

No injuries were reported from the incident.