Scheduled work crew, between Ocean Pkwy./Jones Beach and Exit W6 (Merrick Rd.). + blocks 2 lanes + 24 hrs. UFN.. /southbound over goose creek bride + 2 lanes blocked + 24 hrs. UFN. (nassau)
Scheduled work crew, between Exit M6 (Southern State Pkwy.) and Exit M5 (Hempstead Turnpike East). + scheduled to block 2 lanes + 10pm-6am./ nb between southern state pkwy/xm6 & hempstead tpke/xm5 + 2 lanes scheduled to be blocked + 8pm-6am.(nassau)
Scheduled work crew, between Exit M3 and Exit M2 (Mall/Zeckendorf Blvd.). scheduled to block one lane from 10am until 3pm...// nb between Exit M5 - (Hempstead tpke) and Exit M3E - (Avenue C) 1 lane closed until 3 P.M....// bw at the sloop channel bridge one lane is blocked until 3:30pm
Scheduled work crew, between Sunnyside Blvd. and Round Swamp Rd. Right lane closed, until 2pm...(scheduled) // eb between brush hollow rd (x34) route 106/107 (x35) left lane scheduled to be closed until 2 P.M., Stay left
is looking at Thanksgiving recipes and planning a feast.
Copyright © 2009 Newsday. All rights reserved.
