Scheduled work crew, between Ocean Pkwy./Jones Beach and Exit W6 (Merrick Rd.). + blocks 2 lanes + 24 hrs. ufn.. /sb over goose creek bride + 2 lanes blocked + 24 hrs. ufn. (nassau)
Road closed, between Seaford-Oyster Bay Expressway and S Oyster Bay Rd. Road closed, DUE TO AN OVERTURNED TRACTOR TRAILER(ACCIDEN HAPPENED ON THE EB SIDE, WB CLOSED FOR EMS), Seek alternate
Scheduled work crew, between Exit M6 (Southern State Pkwy.) and Exit M7 (Babylon Turnpike). cleared // SOUTHBOUND construction cleared FROM M5 (HEMPSTEAD TPKE) TO EXIT M6 (SOUTHERN STATE PKWY) UNTIL 6 AM
Scheduled work crew, between Exit W6 (Merrick Rd.) and Ocean Pkwy./Jones Beach. + blocks 2 lanes + 24 hrs. ufn.. /sb over goose creek bride + 2 lanes blocked + 24 hrs. ufn. (nassau)
congratulates the Yankees on winning their 27th title.
Copyright © 2009 Newsday. All rights reserved.
