LIRR's positive train control installation

The LIRR says positive train control is already up and running throughout about 98% of its territory, with the last portion set to come online by month's end. Credit: MTA

The LIRR says positive train control is already up and running throughout about 98% of its territory, with the last portion set to come online by month's end. Credit: MTA
The Newsday app makes it easier to access content without having to log in.